TX PUC revamps ERCOT switching rules, effective 8/16/09
ERCOT resi and small commercial customers will have new switching rules starting 8/16/09 for most territories (TDU’s have until 12/1 to complete changes). Notes:
- On ’standard’ switch (formerly ‘on-cycle’), a customer’s first-available switch date FASD will be set 3 business days after switch received at ERCOT. No special fees, no ‘waive notification’ option,
- If the normal read date is -3 or +3 days after FASD, that read will be used. If outside that 7 day window then a physical read will be made on one of the 4 days after the FASD (TDSP’s have until 12/1/09 to implement).
- The standard switch will be made 4 days after ERCOT receives the switch.
- On ’self-selected’ switch (formerly ‘off-cycle’), a customer is switched on the date selected by the REP, and TDSP fees apply.
- Rescission postcard to customers is replaced by a notification postcard (no option to rescind).
- TDSP’s must have certain percentage of actual reads (reducing estimated reads) by 12/1/2009.
UPDATES: above includes updates noted by Mike at TES Energy Services
The full order is here: http://www.puc.state.tx.us/rules/subrules/electric/25.214/36536adt.pdf
Also see: http://www.puc.state.tx.us/rules/subrules/electric/25.475/25.475.pdf

